| PART |
Description |
Maker |
| TC3827 TC3827-4.2VUA TC3827-4.1VUA |
The TC3827 is a battery charger controller for a single cell Li-Ion battery. Using an external PMOS transistor, safe and fast charging of a single Li-Ion cell is accomplished. Features include over-current foldback, charge current monitor, Lithium-Ion Battery Charger
|
MICROCHIP[Microchip Technology]
|
| AT49BV2048 AT49LV2048 AT49LV2048A AT49LV2048A-70RC |
2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-Voltage??Flash Memory 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-VoltageFlash Memory 2兆位56 × 8/128K × 16)单2.7伏电池电压⑩闪存 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-VoltageFlash Memory 128K X 16 FLASH 3V PROM, 70 ns, PDSO44 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-VoltageFlash Memory 128K X 16 FLASH 2.7V PROM, 90 ns, PDSO48 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-VoltageFlash Memory 128K X 16 FLASH 2.7V PROM, 120 ns, PDSO48 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-Voltage⑩ Flash Memory 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-Voltage Flash Memory 2-megabit (256K x 8/128K x 16) Single 2.7-volt Battery-Voltage?/a> Flash Memory
|
Atmel, Corp. Atmel Corp. ATMEL[ATMEL Corporation]
|
| AT29BV010A |
128K x 8 Single 2.7-volt Battery-Voltage Flash Memory(128K x 8单电.7V Battery-Voltage技术闪速存储器) 128K的8.7伏电池电压快闪记忆体28K的8单电源为2.7V电池电压技术闪速存储器
|
Atmel, Corp.
|
| ISL6292-2C ISL6292-1C ISL6292-1CR5 ISL6292-1CR3-T |
Battery Charger, Single Cell Li-ion or Li-Polymer, Vin >2.4v, Programmable Current Limit, Low Thermal Dissipation, 1% Accuracy Li-ion/Li Polymer Battery Charger
|
INTERSIL[Intersil Corporation]
|
| 5962-8672301RC 5962-8672302RA 5962-86723012C |
Single 8-bit Bus Transceiver NiCd/NiMH Battery Fast-Charge Controllers Low-Noise, 4 1/2 Digit, Single-Chip ADC with Multiplexed LCD Drivers 位总线收发
|
Glenair, Inc.
|
| MIC79050-4.2BM MIC79050-4.2BS |
Simple Lithium-Ion Battery Charger Preliminary Information 1 A BATTERY CHARGE CONTROLLER, PDSO8 GT 48C 48#16 SKT RECP WALL RM 1 A BATTERY CHARGE CONTROLLER, PSSO3
|
Micrel Semiconductor, Inc. MICREL INC
|
| MAX6430 MAX6431 MAX6432 MAX6433 MAX6434 MAX6435 MA |
3.4 V, Low-power, single/dual-level battery monitor with hysteresis Low-Power Single/Dual-Level Battery Monitors with Hysteresis Low-Power, Single/Dual-Level Battery Monitors with Hysteresis 2.4 V, Low-power, single/dual-level battery monitor with hysteresis 3.5 V, Low-power, single/dual-level battery monitor with hysteresis
|
MAXIM[Maxim Integrated Products] MAXIM - Dallas Semiconductor
|
| AOZ9004D AOZ9004DI-00 AOZ9004DI-01 |
Single-Cell Battery Protection IC
|
Alpha & Omega Semiconductors
|
| 2SK2142 2SK1884 2SK1893 2SJ269 2SK1892 2SK1885 2SK |
Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset TRANSISTOR | MOSFET | N-CHANNEL | 30V V(BR)DSS | 22A I(D) | TO-220AB TRANSISTOR | MOSFET | P-CHANNEL | 100V V(BR)DSS | 6A I(D) | TO-220AB TRANSISTOR | MOSFET | N-CHANNEL | 60V V(BR)DSS | 15A I(D) | TO-220AB TRANSISTOR | MOSFET | N-CHANNEL | 60V V(BR)DSS | 30A I(D) | TO-220AB TRANSISTOR | BJT | NPN | 80V V(BR)CEO | 3A I(C) | SOT-186 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 9A条(丁)|20CI TRANSISTOR | MOSFET | N-CHANNEL | 400V V(BR)DSS | 16A I(D) | TO-220AB 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 16A条(丁)| TO - 220AB现有 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 5.5AI(四)| TO - 220AB现有 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 7A条(丁)| TO - 220AB现有 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| P通道| 60V的五(巴西)直| 8A条(丁)| TO - 220AB现有 TRANSISTOR | MOSFET | N-CHANNEL | 450V V(BR)DSS | 10A I(D) | TO-220AB
|
Molex, Inc. Sanyo Electric Co., Ltd.
|
| 2SK3025 2SK3025TENTATIVE |
Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset Silicon N-Channel Power F-MOS FET Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset
|
PANASONIC[Panasonic Semiconductor] Panasonic Corporation
|
| BH-21-3 BH-24-3 BH-22-3 |
BATTERY HOLDERS D, 9V SINGLE & MULTIPLE CELLS
|
Adam Technologies, Inc. http://
|
| BH-03-3 BH-08-3 BH-01-3 BH-05-3 |
BATTERY HOLDERS AA SINGLE & MULTIPLE CELLS
|
Adam Technologies, Inc. http://
|