| PART |
Description |
Maker |
| ST1CC40PUR ST1CC40DR ST1CC40 |
3 A, 850 KHz, MONOLITHIC SYNCHRONOUS STEP-DOWN CONSTANT CURRENT LED DRIVER 3 A monolithic step-down current source with synchronous rectification
|
ST Microelectronics STMicroelectronics
|
| LTC1629 LTC1629C LTC1629I LTC1629C-PG LTC1629CG LT |
PolyPhase, High Efficiency,Synchronous Step-DownSwitching Regulator PolyPhase/ High Efficiency/ Synchronous Step-Down Switching Regulators PolyPhase, High Efficiency, Synchronous Step-Down Switching Regulators RADIATION HARDENED HIGH EFFICIENCY, 5 AMP SWITCHING REGULATORS Dual LinCMOS(TM) Timer 14-SOIC
|
Linear Technology Corporation
|
| SC2441 SC2441ITSTRT SC2441EVB |
Very Low Input Voltage 2-Phase Synchronous Step-down Controllers with Step-up Converter
|
Semtech Corporation
|
| SC2441ATETRT SC2441AEVB SC2441A |
1.8V to 20V Input 2-Phase Synchronous Step-down Controllers with Step-up Converter
|
Semtech Corporation
|
| MB3827PFV MB3827 |
6-ch DC/DC Converter IC With Synchronous Rectification for voltage step-up and step-down
|
Fujitsu Microelectronics FUJITSU[Fujitsu Media Devices Limited]
|
| EV2104DJ-00A CMD4D06-100 MP2104DJ-1.8 MP2104DJ-1.5 |
1.7MHz, 600mA Synchronous Step-Down Converter 1.4 A SWITCHING REGULATOR, 2080 kHz SWITCHING FREQ-MAX, PDSO5 1.7MHz, 600mA Synchronous Step-Down Converter .7MHz00mA的同步降压转换器
|
Monolithic Power Systems, Inc.
|
| AP3421A AP3421DNTR-G1 |
1.3MHz, DUAL 1.0A SYNCHRONOUS STEP-DOWN CONVERTER 1.3MHz, DUAL 1.0A SYNCHRONOUS STEP-DOWN CONVERTERS
|
Diodes
|
| 5962-8994204QA 5962-8994201XX 5962-8994203QA |
High-Speed Step-Down Controller with Accurate Current Limit for Notebook Computers 3µs, 12-Bit ADC 1A/2.7A, 1MHz, Step-Down Regulators with Synchronous Rectification and Internal Switches 多模先进先出
|
Nihon Inter Electronics, Corp.
|
| LTC3868EGN-1TRPBF LTC3868-1-15 |
Low IQ, Dual 2-Phase Synchronous 2-Phase Synchronous Step-Down Controller; Package: 28-SSOP; Temperature Range: –40°C to 125°C DUAL SWITCHING CONTROLLER, 900 kHz SWITCHING FREQ-MAX, PDSO28 Low IQ, Dual 2-Phase Synchronous Step-Down Controller
|
Linear Technology, Corp.
|
| ADP2119 ADP2120 |
2A, 1.2MHz Synchronous Step-Down DC-to-DC Regulator 1.25A, 1.2MHz Synchronous Step-Down DC-to-DC Regulator
|
Analog Devices
|
| LTC1876EGTR |
High Efficiency, 2-Phase, Dual Synchronous Step-Down Switching Controller and Step-Up Regulator; Package: SSOP; No of Pins: 36; Temperature Range: -40°C to 125°C
|
LINEAR TECHNOLOGY CORP
|
| MAX1644 MAX1644EAE |
2A, low-voltage, step-down regulator with synchronous rectification and intemal switches 2A, Low-Voltage, Step-Down Regulator with Synchronous Rectification and Internal Switches
|
MAXIM - Dallas Semiconductor Maixm
|