| PART |
Description |
Maker |
| DF005S DF005M DF10S DF01M DF01S DF02M DF02S DF04M |
1000V Bridge in a D-71 package 800V Bridge in a D-71 package 400V Bridge in a D-71 package 200V Bridge in a D-71 package 100V Bridge in a D-71 package 50V Bridge in a D-71 package 600V Bridge in a D-71 package 1A Single Phase D.I.L. Rectifier Bridge (1.0A, from 50 to 1000V)
|
IRF[International Rectifier]
|
| MB351W-BP MB354W-BP MB3510W-BP MB3505W-BP MB356W-B |
35 Amp Single Phase Bridge Rectifier 50 to 1000 Volts RECT BRIDGE 35A 200V WIRE LEADS 35 A, 200 V, SILICON, BRIDGE RECTIFIER DIODE
|
天津环球磁卡股份有限公司 http:// Micro Commercial Components, Corp. Micro Commercial Compon...
|
| RBU801M RBU801M10 RBU804M RBU805M RBU806M RBU801M- |
8 A, 50 V, SILICON, BRIDGE RECTIFIER DIODE SINGLE-PHASE GLASS PASSIVATED SILICON BRIDGE RECTIFIER VOLTAGE RANGE 50 to 1000 Volts CURRENT 8.0 Amperes 8 A, 400 V, SILICON, BRIDGE RECTIFIER DIODE 8 A, 600 V, SILICON, BRIDGE RECTIFIER DIODE 8 A, 800 V, SILICON, BRIDGE RECTIFIER DIODE
|
RECTRON LTD Rectron Semiconductor
|
| 6GBU005 6GBU01 6GBU02 6GBU04 6GBU06 6GBU08 |
50V Bridge in a GBU package 100V Bridge in a GBU package 200V Bridge in a GBU package 400V Bridge in a GBU package 600V Bridge in a GBU package 800V Bridge in a GBU package
|
International Rectifier
|
| GBJ1500511 GBJ1510-BP |
15 Amp Glass Passivated Bridge Rectifier 50 to 1000 Volts RECT BRIDGE GPP 15A 1000V GBJ 15 A, 1000 V, SILICON, BRIDGE RECTIFIER DIODE
|
Micro Commercial Components, Corp.
|
| RBV-2506 RBV-1506 RBV-1506S RBV-1306 RBA-1506S RBV |
Bridge Diodes 25 A, 600 V, SILICON, BRIDGE RECTIFIER DIODE 600V,Bridge Diodes(600V,桥二极 600V的,桥二极管00V的,桥二极管
|
http:// SANKEN[Sanken electric] Sanken Electric Co.,Ltd. Sanken Electric Co., Ltd.
|
| CBR2-L080M CBR2-L060M CBR1-L0100M CBR1-L010M CBR1- |
SILICON BRIDGE RECTIFER 1.5 A, 100 V, SILICON, BRIDGE RECTIFIER DIODE SILICON BRIDGE RECTIFER 1.5 A, 200 V, SILICON, BRIDGE RECTIFIER DIODE Leaded Bridge Rectifier General Purpose
|
Central Semiconductor, Corp. Central Semiconductor Corp. CENTRAL[Central Semiconductor Corp]
|
| CBR10-100P CBR35-100P CBR10-010P CBR10-020P CBR10- |
Leaded Bridge Rectifier General Purpose SILICON BRIDGE RECTIFIER 35 A, 1000 V, SILICON, BRIDGE RECTIFIER DIODE SILICON BRIDGE RECTIFIER 35 A, 800 V, SILICON, BRIDGE RECTIFIER DIODE SILICON BRIDGE RECTIFIER 10 A, 600 V, SILICON, BRIDGE RECTIFIER DIODE SILICON BRIDGE RECTIFIER 10 A, 800 V, SILICON, BRIDGE RECTIFIER DIODE SILICON BRIDGE RECTIFIER 25 A, 1000 V, SILICON, BRIDGE RECTIFIER DIODE 25 A, 600 V, SILICON, BRIDGE RECTIFIER DIODE 35 A, 200 V, SILICON, BRIDGE RECTIFIER DIODE 25 A, 200 V, SILICON, BRIDGE RECTIFIER DIODE
|
Central Semiconductor C... CENTRAL[Central Semiconductor Corp] Central Semiconductor Corp. Central Semiconductor, Corp.
|
| CBR2-100 CBR1-010 CBR1-020 CBR1-040 CBR1-060 CBR1- |
SILICON BRIDGE RECTIFIERS 2 A, 400 V, SILICON, BRIDGE RECTIFIER DIODE Leaded Bridge Rectifier General Purpose
|
Central Semiconductor, Corp. Central Semiconductor Corp. CENTRAL[Central Semiconductor Corp]
|
| SDA276A SDA276B SDA276C SDA276D SDA276E SDA276F SD |
SINGLE PHASE BRIDGE RECTIFIER 1AMP FAST RECOVERRY RECTIFIER BRIDGE ASSEMBLY 3 A, 1000 V, SILICON, BRIDGE RECTIFIER DIODE 1AMP FAST RECOVERRY RECTIFIER BRIDGE ASSEMBLY 3 A, 600 V, SILICON, BRIDGE RECTIFIER DIODE 3 A, 800 V, SILICON, BRIDGE RECTIFIER DIODE
|
Solid States Devices, Inc Solid State Devices, Inc. SOLID STATE DEVICES INC
|
| KBL405G KBL407G KBL401G KBL402G |
Single Phase 4.0AMPS. Glass Passivated Bridge Rectifiers 4 A, 50 V, SILICON, BRIDGE RECTIFIER DIODE 4 A, 100 V, SILICON, BRIDGE RECTIFIER DIODE
|
Taiwan Semiconductor Company, Ltd
|