Part Number Hot Search : 
MPC9446 ACR42 BH7867FS 95022 2SJ10607 BA30DD0T KBK15B STP5011D
Product Description
Full Text Search

EVM31-050A - 150 A, 600 V, 2 CHANNEL, NPN, Si, POWER TRANSISTOR

EVM31-050A_7013537.PDF Datasheet

 
Part No. EVM31-050A
Description 150 A, 600 V, 2 CHANNEL, NPN, Si, POWER TRANSISTOR

File Size 152.12K  /  4 Page  

Maker

N/A



JITONG TECHNOLOGY
(CHINA HK & SZ)
Datasheet.hk's Sponsor

Part: EVM31-050A
Maker: FUJI
Pack: 模块
Stock: Reserved
Unit price for :
    50: $21.60
  100: $20.52
1000: $19.44

Email: oulindz@gmail.com

Contact us

Homepage
Download [ ]
[ EVM31-050A Datasheet PDF Downlaod from Datasheet.HK ]
[EVM31-050A Datasheet PDF Downlaod from Maxim4U.com ] :-)


[ View it Online ]   [ Search more for EVM31-050A ]

[ Price & Availability of EVM31-050A by FindChips.com ]

 Full text search : 150 A, 600 V, 2 CHANNEL, NPN, Si, POWER TRANSISTOR
 Product Description search : 150 A, 600 V, 2 CHANNEL, NPN, Si, POWER TRANSISTOR


 Related Part Number
PART Description Maker
STF23NM60N STI23NM60N STW23NM60N STP23NM60N STB23N N-channel 600 V - 0.150 ヘ - 19 A - D2PAK - I2PAK - TO-220/FP TO-247, second generation MDmesh⑩ Power MOSFET
N-channel 600 V - 0.150 Ω - 19 A - D2PAK - I2PAK - TO-220/FP TO-247, second generation MDmesh?/a> Power MOSFET
N-channel 600 V - 0.150 Ω - 19 A - D2PAK - I2PAK - TO-220/FP TO-247, second generation MDmesh Power MOSFET
N-channel 600 V - 0.150 楼? - 19 A - D2PAK - I2PAK - TO-220/FP TO-247, second generation MDmesh垄芒 Power MOSFET
http://
STMicroelectronics
PM150CBS060 Intellimod?Module MAXISS Series?Multi AXIS Servo IPM (150 Amperes/600 Volts)
Intellimod Module MAXISS Series Multi AXIS Servo IPM (150 Amperes/600 Volts)
Intellimod⑩ Module MAXISS Series⑩ Multi AXIS Servo IPM (150 Amperes/600 Volts)
IntellimodModule MAXISS SeriesMulti AXIS Servo IPM (150 Amperes/600 Volts)
Powerex Power Semicondu...
POWEREX[Powerex Power Semiconductors]
6MBI150FB-060 IGBT MODULE 150 A, 600 V, N-CHANNEL IGBT
Fuji Electric Holdings Co., Ltd.
FUJI[Fuji Electric]
61084-300 61084 61084-001 61084-002 61084-101 6108 TV 29C 29#20 PIN PLUG 150 mA, 20 V, NPN, Si, SMALL SIGNAL TRANSISTOR
TV 42C 36#22D 6#8(TWINAX) SKT 150 mA, 20 V, NPN, Si, SMALL SIGNAL TRANSISTOR
SURFACE MOUNT (NPN) GENERAL PURPOSE TRANSISTOR
Micropac Industries, Inc.
MICROPAC[Micropac Industries]
CM150DU-12F Trench Gate Design Dual IGBTMOD?/a> 150 Amperes/600 Volts
Trench Gate Design Dual IGBTMOD 150 Amperes/600 Volts
Trench Gate Design Dual IGBTMOD⑩ 150 Amperes/600 Volts
POWEREX[Powerex Power Semiconductors]
RFT3055 RFT3055LE HGTG20N120CND FN4537 2.0A, 60V, 0.150 Ohm, N-Channel, Logic Level, ESD Rated, Power MOSFET 2.0安培0V的,0.150 Ohm的N通道,逻辑层次,额定静电,功率MOSFET
2.0A/ 60V/ 0.150 Ohm/ N-Channel/ Logic Level/ ESD Rated/ Power MOSFET
63A, 1200V, NPT Series N-Channel IGBT with Anti-Parallel Hyperfast Diode
2.0A 60V 0.150 Ohm N-Channel Logic Level ESD Rated Power MOSFET
From old datasheet system
Fairchild Semiconductor, Corp.
INTERSIL[Intersil Corporation]
MBT2222ADW1T1G General Purpose Transistor Dual NPN; Package: SC-88/SC70-6/SOT-363 6 LEAD; No of Pins: 6; Container: Tape and Reel; Qty per Container: 3000 600 mA, 40 V, 2 CHANNEL, NPN, Si, SMALL SIGNAL TRANSISTOR
ON Semiconductor
MMBT5401 600 mA, 150 V, PNP, Si, SMALL SIGNAL TRANSISTOR
MICRO COMMERCIAL COMPONENTS
CM150DU-12H Dual IGBTMOD 150 Amperes/600 Volts
POWEREX[Powerex Power Semiconductors]
PM150CL1B060 Three Phase IGBT Inverter 150 Amperes/600 Volts
Powerex Power Semiconductors
 
 Related keyword From Full Text Search System
EVM31-050A command EVM31-050A terminal EVM31-050A cost EVM31-050A informacion de EVM31-050A audio
EVM31-050A Register EVM31-050A transient design EVM31-050A components EVM31-050A download EVM31-050A eeprom
 

 

Price & Availability of EVM31-050A

All Rights Reserved © IC-ON-LINE 2003 - 2022  

[Add Bookmark] [Contact Us] [Link exchange] [Privacy policy]
Mirror Sites :  [www.datasheet.hk]   [www.maxim4u.com]  [www.ic-on-line.cn] [www.ic-on-line.com] [www.ic-on-line.net] [www.alldatasheet.com.cn] [www.gdcy.com]  [www.gdcy.net]


 . . . . .
  We use cookies to deliver the best possible web experience and assist with our advertising efforts. By continuing to use this site, you consent to the use of cookies. For more information on cookies, please take a look at our Privacy Policy. X
0.63740396499634