| PART |
Description |
Maker |
| PQ-100B PQ-100C PQ-100D PQ-100E PD-110B PD-110A |
CAP,CERM,TRIM,8mm,4-34pF, 250V,COLOR YELLOW CAP,CERM,TRIM,8mm,6-70pF, 250V,COLOR NIL CAP,CERM,TRIM,8mm,8.5-120pF, 250V,COLOR NIL 100W Quad Output Switching Power Supply CAP,CERM,TRIM,8mm,8.5-100pF, 250V,COLOR PURPLE CAP,CERM,TRIM,5mm,9-50pf, 200VDC COLOR GREEN,2 LEADS
|
Astrodyne, Inc.
|
| EVM-2NSX80B22 EVM-2NSX80B24 EVM-2WSX80B14 EVM2N EV |
2 mm Square Low-Profi le SMT Trimmer Potentiometers (Cermet, Open Frame Type) SMT Trimmer Potentiometers/EVM2N/2W
|
Panasonic Semiconductor
|
| EVM-3VSX50B14 EVM-3VSX50B15 |
3 mm Square SMT Trimmer Potentiometers with the rotation stopper (Cermet, Open Frame Type) 3 mm square SMT Trimmer Portentiomerters with rotation stopper (cermet, open frame type)
|
Panasonic Semiconductor
|
| EVM2NSX80B52 EVM2T EVM2W |
2 mm Square Low-Profi le SMT Trimmer Potentiometers (Cermet, Open Frame Type)
|
Panasonic Semiconductor
|
| EVM-3WSX80B14 EVM3W |
3 mm Square Low-Profile SMT Trimmer Potentiometers ( Cermet, Open Frame Type)
|
Panasonic Semiconductor
|
| LN352GPX |
Square Type 4.0 mm × 4.0 mm Series
|
Matsshita / Panasonic
|
| LN450YPX |
Square Type 5.0 mm × 5.0 mm Series
|
Matsshita / Panasonic
|
| LNG449YKX LN449YPX LN849RPX LN249RPX |
Square Type 5.7 mm × 2.7 mm Series
|
Matsshita / Panasonic
|
| LN352GPH LN252RPH |
Square Type 4.0 mm × 4.0 mm Series From old datasheet system
|
Matsshita / Panasonic
|
| SMS36XXXXX |
Trim Trio Interconnection System
|
Burndy
|
| LM12288ABRG |
LM1288A/BRG Series ?1.20 inch 5x7 Dual Color Square Dot Matrix LED Display
|
LightKey Optoelectronic...
|
| ZL2005PALRFT1 |
Digital-DC?Controller with Drivers and POLA/DOSA Trim
|
Intersil Corporation
|
|