| PART |
Description |
Maker |
| WBS1.5-5-3S4 |
SMD wideband chokes EMI-suppression products
|
Ferroxcube International Holding B.V.
|
| ACM0434CI |
COMMON MODE CHOKES Excellent EMI performance
|
Allied Components International
|
| ACM0801CS |
COMMON MODE CHOKES Excellent EMI performance
|
Allied Components International
|
| CCJ-2-222 CCJ-4-250C CCJ-2-703 CCJ-4-681 CCJ-2-102 |
Compact SMD Common Mode Chokes
|
Nuvotem Talema
|
| B82732F2451B001 B82732F2801B001 B82732F2132B001 B8 |
Power line chokes Current-compensated frame core double chokes
|
EPCOS
|
| B82731T2351A020 B82731T2651A020 B82731T2182A020 B8 |
Current-compensated E core double chokes Power line chokes
|
EPCOS
|
| B82747-F4103-N1 B82747-F4602-N1 B82747-F4163-N1 B8 |
Chokes for Power Lines Current-Compensated Ring Core Triple Chokes 扼流圈电力线路电流补偿扼流圈环三核心
|
EPCOS AG
|
| P3214-AL P3218-AL P3220-AL P3224-AL |
Common Mode Line Chokes Common mode choke, toroid, RoHS SINGLE PHASE EMI FILTER
|
Coilcraft lnc. Coilcraft, Inc. COILCRAFT INC
|
| B82734-W2132-B30 B82734-W2142-B30 B82734-W2232-B30 |
Chokes for Power Lines D Core Chokes 扼流圈电力线D核心扼流
|
EPCOS AG
|
| HA3-2625-5 HA9P2625-5 HA9P2625-9 HA-2620 HA-2625 H |
From old datasheet system 100MHz High Input Impedance Very Wideband Uncompensated Operational Amplifiers 100MHz/ High Input Impedance/ Very Wideband/ Uncompensated Operational Amplifiers INDUCTOR PWR TOROID 2.5UH SMD 100MHz, High Input Impedance, Very Wideband, Uncompensated Operational Amplifiers OP-AMP, 7000 uV OFFSET-MAX, 100 MHz BAND WIDTH, PDSO8
|
INTERSIL[Intersil Corporation] Intersil, Corp.
|
| B82617-F2103-M1 B82625-B2202-M1 B82625-B2102-M1 B8 |
Chokes for Power Lines Ring Core Chokes with Iron Powder Core 电力线环芯电感扼流圈与铁粉芯
|
EPCOS AG
|