| PART |
Description |
Maker |
| AD73322L AD73322LAST EVAL-AD73322LEB AD73322LAR AD |
Dual-Channel, 3 V Front-End Processor for General Purpose Applications Including Speech and Telephony Low Cost, Low Power CMOS General Purpose Dual Analog Front End Low Cost/ Low Power CMOS General-Purpose Dual Analog Front End Low Cost, Low Power CMOS General-Purpose Dual Analog Front End
|
AD[Analog Devices]
|
| TC7662BEOA TC7662BCOA TC7662B TC7662BCPA TC7662BEP |
The TC7662B is a pin-compatible upgrade to the Industry standard TC7660 charge pump voltage converter. It converts a 1.5V to 15V input to a corresponding – 1.5 to – 15V output using only two low-cost capacitors, eliminating i Analog IC - Datasheet Reference CHARGE PUMP DC-TO-DC VOLTAGE CONVERTER
|
Microchip Technology Inc MICROCHIP[Microchip Technology]
|
| AD8383ACPZ AD8383 |
Low Cost 10-Bit, 6-Channel Output Decimating LCD DecDriver LIQUID CRYSTAL DISPLAY DRIVER, QCC48 Low Cost 10-Bit, 6-Channel Output Decimating LCD DecDriver 低成0位,6通道输出液晶DecDriver元气 Low Cost 10-Bit, 6-Channel Output Decimating LCD DecDriver®
|
Analog Devices, Inc. AD[Analog Devices]
|
| AD853108 AD8532ARM-R2 AD8532ARM-REEL AD8532ARMZ-R2 |
Low Cost, 250 mA Output, Single-Supply Amplifiers Dual, Low Cost, 250 mA Output, Single-Supply Amplifier; Package: SOIC; No of Pins: 8; Temperature Range: Industrial DUAL OP-AMP, 30000 uV OFFSET-MAX, 2.2 MHz BAND WIDTH, PDSO8
|
http:// Analog Devices, Inc.
|
| MAX4400 MAX4400AUK-T MAX4400AXK-T MAX4401 MAX4401A |
Single/Dual/Quad, Low-Cost, Single-Supply, Rail-to-Rail Op Amps with Shutdown 四路、低成本、单电源、满摆幅运算放大器,带有关断 Single/Dual/Quad, Low-Cost, Single-Supply, Rail-to-Rail Op Amps with Shutdown OP-AMP, 6500 uV OFFSET-MAX, 0.8 MHz BAND WIDTH, PDSO6 Single/Dual/Quad / Low-Cost / Single-Supply / Rail-to-Rail Op Amps with Shutdown
|
Maxim Integrated Products, Inc. MAXIM[Maxim Integrated Products] MAXIM - Dallas Semiconductor
|
| ST7MDT2 ST7MDT2-110 ST7MDT2-220 ST7MDT2-DVP ST7MDT |
A Low-Cost Development Package Including A Full Real-Time Emulation Board(低价格开发软件包) MDT2-DVP LOW COST ST7 DEVELOPMENT KIT DATASHEET MOSFET; Transistor Polarity:Dual N/P Channel; Drain Source Voltage, Vds:30V; Continuous Drain Current, Id:51A; On-Resistance, Rds(on):0.36ohm; Rds(on) Test Voltage, Vgs:10V; Package/Case:6-TSOP; Drain-Source Breakdown Voltage:30V From old datasheet system MDT2-DVP LOW COST ST7 DEVELOPMENT KIT DATASHEET
|
意法半导 STMICROELECTRONICS[STMicroelectronics] ST Microelectronics
|
| AD8061 AD8061ART-REEL7 AD8062AR-REEL AD8062AR-REEL |
Low-Cost, 300 MHz Rail-to-Rail Amplifiers Low Cost, Single with Disable, 300MHz Rail-to-Rail Amplifiers Low Cost, Dual, 300MHz Rail-to-Rail Amplifiers Low Cost, Single, 300MHz Rail-to-Rail Amplifiers Low Cost, 275 MHz Rail-to Rail Amplifiers Circular Connector; MIL SPEC:MIL-C-26482, Series I, Solder; Body Material:Aluminum; Series:PT06; No. of Contacts:6; Connector Shell Size:10; Connecting Termination:Solder; Circular Shell Style:Straight Plug; Body Style:Straight Circular Connector; No. of Contacts:11; Series:; Body Material:Aluminum; Connecting Termination:Solder; Connector Shell Size:18; Circular Contact Gender:Socket; Circular Shell Style:Straight Plug; Insert Arrangement:18-11 PT 10C 10#20 SKT PLUG Low-Cost, 300 MHz Rail-to-Rail Amplifiers OP-AMP, 6000 uV OFFSET-MAX, PDSO5 16-Bit, 8-Channel Serial Output Sampling Analog-to-Digital Converter 20-SSOP/QSOP DUAL OP-AMP, 6000 uV OFFSET-MAX, PDSO8
|
AD[Analog Devices] Analog Devices, Inc. ANALOG DEVICES INC
|
| EL2211CS EL2411CS EL2210 EL2210CN EL2210CS EL2210C |
Low Cost, Dual, Triple and Quad Video Op Amps 1 CHANNEL, VIDEO AMPLIFIER, PDSO8
|
Intersil, Corp. INTERSIL[Intersil Corporation]
|
| MAX4456EQHD MAX4663EAE MAX4663EAET MAX4520EUAT MAX |
Low-Cost 4x4, 8x4, 8x8 Video Crosspoint Switches 8-CHANNEL, CROSS POINT SWITCH, PQCC44 2.5 Ohm Quad, SPST, CMOS Analog Switches QUAD 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO16 Rail-to-Rail, Fault-Protected, SPST Analog Switches 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO8 Low-Voltage, Quad, SPST CMOS Analog Switches QUAD 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDIP14 Low-Voltage, Single-Supply Dual SPST/SPDT Analog Switches DUAL 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO8 Fault-Protected, High-Voltage, Single 4-to-1/Dual 2-to-1 Multiplexers 4-CHANNEL, SGL ENDED MULTIPLEXER, PDSO14 Audio/Video Switch for Dual SCART Connectors DUAL 7-CHANNEL, AUDIO/VIDEO SWITCH, QCC48 Precision, Low-Voltage, SPST CMOS Analog Switch DUAL 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO16 Quad, Low-Voltage SPST Analog Switches QUAD 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO16 Rail-to-Rail, Fault-Protected, SPST Analog Switches 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO6 High-Speed, Low-Voltage, CMOS Analog Multiplexers/Switches 4-CHANNEL, DIFFERENTIAL MULTIPLEXER, PDIP16 Serially Controlled, Clickless Audio/Video Switches 11 1-CHANNEL, AUDIO/VIDEO SWITCH, PDSO28 Low-Voltage, Single 8 to 1 and Dual 4 to 1 Cal Multiplexers 4-CHANNEL, DIFFERENTIAL MULTIPLEXER, PDSO20 Low-Voltage, Dual-Supply, SPST, CMOS Analog Switches 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO5 ±15kV ESD-Protected, Low-Voltage, Dual, SPST, CMOS Analog Switches
|
Maxim Integrated Products, Inc. MAXIM INTEGRATED PRODUCTS INC
|
| LTC3633-15 |
Dual Channel 3A, 15V Monolithic Synchronous Step-Down Regulator
|
Linear Technology
|
| ADXL202 ADXL202AQC ADXL202JQC ADXL210 ADXL210AQC A |
Low Cost 62 g/610 g Dual Axis Accelerometers with Digital Output(124.95 k) Circular Connector; No. of Contacts:26; Series:LJTPQ00R; Body Material:Aluminum; Connecting Termination:Crimp; Connector Shell Size:17; Circular Contact Gender:Socket; Circular Shell Style:Wall Mount Receptacle Low Cost -2 g/ -10 g Dual Axis iMEMS Accelerometers with Digital Output
|
Analog Devices, Inc. AD[Analog Devices] http://
|
| AD8129 AD8130 AD8129ARM-REEL72 AD8130ARM-REEL72 AD |
Low-Cost 200MHz Differential Receiver Amplifier IC,DIFFERENTIAL AMPLIFIER,SINGLE,SOP,8PIN,PLASTIC From old datasheet system Low-Cost High-Speed Differential Receiver and Driver Low-Cost 270 MHz Differential Receiver Amplifiers 低成70 MHz的差分接收器放大 Low-Cost 270 MHz Differential Receiver Amplifiers SPECIALTY ANALOG CIRCUIT, PDSO8
|
AD[Analog Devices] adi Analog Devices, Inc.
|
|