| PART |
Description |
Maker |
| EVM649APJ EDGE649 E649-EDGE649 |
Octal Pin Electronics Driver / Receiver Octal Pin Electronics Driver/Receiver
|
Semtech Corporation
|
| EDGE693 E693AHJ EVM693AHJ E693-EDGE693 |
500 MHz Monolithic Dual Pin Electronics Driver
|
SEMTECH[Semtech Corporation]
|
| ISL55100A ISL55100AIRZ ISL5100A |
Quad 18V Pin Electronics Driver/Window Comparator From old datasheet system
|
Intersil Corporation
|
| EVM649EVM E649BPJ EDGE649 E649 |
Low Power 5V RS232 Dual Driver/Receiver with 0.1?碌F Capacitors; Package: SO; No of Pins: 16; Temperature Range: -40?掳C to 85?掳C Low Power 5V RS232 Dual Driver/Receiver with 0.1?μF Capacitors; Package: SO; No of Pins: 16; Temperature Range: -40?°C to 85?°C Octal Pin Electronics Driver/Receiver
|
SEMTECH[Semtech Corporation]
|
| 74ABT2541 74ABT2541CMSA 74ABT2541CMTC 74ABT2541CSC |
Octal Buffer/Line Driver with 25 Ohm Series Resistors in the Outputs [Advanced] Octal Buffer/Line Driver with 25?/a> Series Resistors in the Outputs Octal Buffer/Line Driver with 25з Series Resistors in the Outputs Octal Buffer/Line Driver with 25 Series Resistors in the Outputs From old datasheet system Octal Buffer/Line Driver with 25-Ohm Series Resistors in the Outputs 8-Bit Non-Inverting Buffer/Driver
|
FAIRCHILD[Fairchild Semiconductor] Fairchild Semiconductor Corporation
|
| 74HC540 74HCT540N HCT540 74HC540D 74HC540N 74HCT54 |
Octal buffer/line driver; 3-state inverting 74HC/HCT540; Octal buffer/line driver; 3-state; inverting IC-SM-74HCTCMOS
ICHIGHSPEEDCMOSLOGIKN/DIP20
Octal buffer/line driver 3-state inverting Octal buffer-line driver; 3-state; inverting
|
NXP Semiconductors PHILIPS[Philips Semiconductors]
|
| E6420BBG EDGE6420 |
Per-Pin Electronics Companion DAC
|
Semtech Corporation
|
| 6420EVM |
Per-Pin Electronics Companion DAC
|
Semtech Corporation
|
| EVM6435 EVM6436 EDGE6435 EDGE6436 |
Per-Pin Electronics Companion DAC
|
Semtech Corporation
|
| CBT3245APW CBT3245A CBT3245ABQ CBT3245AD CBT3245AD |
CBT3245A; Octal bus switch Octal bus switch; Package: SOT764-1 (DHVQFN20); Container: Reel Pack, SMD, 7" CBT/FST/QS/5C/B SERIES, OCTAL 1-BIT DRIVER, TRUE OUTPUT, PQCC20
|
PHILIPS[Philips Semiconductors] NXP Semiconductors N.V.
|
| ACS541D ACS541HMSR ACS541K ACS541MS 5962F9671001VR |
Buffer/Line Driver, Octal, Tri-State, Rad-Hard, Advanced Logic, CMOS Radiation Hardened Octal Buffer/ Line Driver Three-State From old datasheet system
|
INTERSIL[Intersil Corporation]
|