| PART |
Description |
Maker |
| CS5535-UDC |
Companion Device Data Book 208-Pin BGA SERIAL COMM CONTROLLER, PBGA208
|
Advanced Micro Devices, Inc.
|
| EVM649APJ EDGE649 E649-EDGE649 |
Octal Pin Electronics Driver / Receiver Octal Pin Electronics Driver/Receiver
|
Semtech Corporation
|
| EDGE693 E693AHJ EVM693AHJ E693-EDGE693 |
500 MHz Monolithic Dual Pin Electronics Driver
|
SEMTECH[Semtech Corporation]
|
| ISL55100BIRZ ISL55100B |
Quad 18V Pin Electronics Driver/Window Comparator
|
Intersil Corporation
|
| E8410A |
1GHz Dual Channel, Digitally Programmed Pin Electronics Solution
|
Semtech Corporation
|
| EVM7804BHFT E7804BHFT |
133 MHZ Quad Pin Electronics Driver and Window Comparator
|
Semtech Corporation
|
| ISL55164 |
SOC Dual Channel 133MHz Pin Electronics Solution 3.75ns Minimum Pulse Width
|
Intersil Corporation
|
| EVM646ATF |
Pin Electronics Driver, Window Comparator, and Switch Matrix
|
Semtech Corporation
|
| EDGE818 |
Octal 18V Pin Electronics Driver/window Comparator
|
Semtech Corporation
|
| 0022288362 42377-0106 22-28-8362 |
2.54mm (.100) Pitch KK? Header, Breakaway, Right Angle Surface Mount Compatible, 36 Circuits, 0.38μm (15μ) Gold (Au) Selective Plating, Mating Pin Length 6.20mm (.244) Molex Electronics Ltd.
|
Molex Electronics Ltd.
|
| CIC751 |
Companion IC
|
Infineon Technologies
|
| MB86940 |
Companion Chip
|
Fujitsu
|