| PART |
Description |
Maker |
| EVM629AXF EDGE629 |
1 GHz Timing Deskew and Quad Fanout Element
|
Semtech Corporation
|
| ADATE207-15 |
Quad Pin Timing Formatter
|
Analog Devices
|
| T7504 T5504-ML |
Quad PCM codec with filters. Timing mode nondelayed. T7504 and T75504 Quad PCM Codecs with Filters
|
Agere Systems, Inc.
|
| 1680A 1680AD 1681A 1681AD 1682A 1682AD 1683A 1683A |
1680A Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 136 Channels, 1M Memory 1680AD Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 136 Channels, 4M Memory 1681A Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 102 Channels, 1M Memory 1681AD Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 102 Channels, 4M Memory 1682A Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 68 Channels, 1M Memory 1682AD Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 68 Channels, 4M Memory 1683A Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 34 Channels, 1M Memory 1683AD Standalone Logic Analyzer with 800 MHz Timing/200 MHz State, 34 Channels, 4M Memory 1690A PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 136 Channels, 1M Memory 1690AD PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 136 Channels, 4M Memory 1691A PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 102 Channels, 1M Memory 1691AD PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 102 Channels, 4M Memory 1692A PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 68 Channels, 1M Memory 1692AD PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 68 Channels, 4M Memory 1693A PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 34 Channels, 1M Memory 1693AD PC-Hosted Logic Analyzer with 800 MHz Timing/200 MHz State, 34 Channels, 4M Memory
|
Agilent (Hewlett-Packard)
|
| ICS952802 |
Programmable Timing Control Hub for P4 Processors Programmable Timing Control Hu for P4 processor
|
ICST[Integrated Circuit Systems]
|
| ICS950908 |
Programmable Timing Control Hub⑩ for P4⑩ Programmable Timing Control Hub for P4
|
ICST[Integrated Circuit Systems]
|
| ICS9248-157 ICS9248YF-157-T ICS9248YF-157LF-T AV92 |
Frequency timing generator for Pentium II system Two Chip Solution for Pentium II using ALI 1621/1632M Style Chipsets Frequency Timing Generator for Pentium II Systems 139.65 MHz, PROC SPECIFIC CLOCK GENERATOR, PDSO28 0.209 INCH, SSOP-28
|
ICST[Integrated Circuit Systems] Integrated Device Technology, Inc. INTEGRATED DEVICE TECHNOLOGY INC
|
| ICS950902YFLF-T ICS950902YGLF-T |
Programmable Timing Control Hub?/a> for P4?/a> Programmable Timing Control Hubfor P4
|
Integrated Circuit Systems
|
| PE87FL1013 |
11 Section Bandpass Filter With SMA Female Connectors Operating From 2 GHz to 4 GHz With a 2 GHz Passband
|
Pasternack Enterprises,...
|
| UPB1502GR UPB1502GR1 UPB1502GR1-E1 UPB1502GR-E1 |
1.7 GHz/ 2.0 GHz LOW-POWER TWO-MODULUS PRESCALER DIVIDED-BY-64/65, 128/129 1.7千兆 2.0 GHz的低功耗双分频DIVIDED-BY-64/65,一百二十九分之一百二十八 1.7 GHz/ 2.0 GHz Low-Power Two-Modulus Prescaler(1.7GHz 2.0GHz 定标
|
NEC, Corp. NEC Corp.
|