| PART |
Description |
Maker |
| EVM4707BBG EDGE4707B |
Quad Channel Per-Pin Precision Measurement Unit
|
Semtech Corporation
|
| MAX364-MAX365 MAX365CPE MAX365CSE MAX365EPE MAX365 |
Precision Quad SPST Analog Switches Precision, Quad, SPST Analog Switches QUAD 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDSO16 Precision, Quad, SPST Analog Switches QUAD 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDIP16 Dual LVDS Transmitter/Receiver 16-TSSOP Precision / Quad / SPST Analog Switches
|
MAXIM - Dallas Semiconductor MAXIM[Maxim Integrated Products] Maxim Integrated Products, Inc. MAXIM INTEGRATED PRODUCTS INC
|
| MAX351 MAX351CPE MAX351CSE MAX351EJE MAX351EPE MAX |
MuxIt (TM) PLL Frequency Multiplier 28-TSSOP -40 to 85 Precision, Quad, SPST Analog Switches Precision Quad SPST Analog Switches BATTERY, AA 1.5V PROCELL PK10 Precision / Quad / SPST Analog Switches
|
MAXIM INTEGRATED PRODUCTS INC http:// Maixm MAXIM[Maxim Integrated Products] Maxim Integrated Products, Inc. MAXIM - Dallas Semiconductor
|
| IRHQ7110 IRHQ4110 IRHQ8110 IRHQ3110 IRHQ8110N IRHQ |
100V Quad N-Channel MOSFET in a 28-pin LCC package 100V 1000kRad Hi-Rel Quad N -Channel TID Hardened MOSFET in a 28-pin LCC package RADIATION HARDENED POWER MOSFET SURFACE MOUNT (LCC-28) 100V 100kRad Hi-Rel Quad N -Channel TID Hardened MOSFET in a 28-pin LCC package
|
IRF[International Rectifier]
|
| IRHQ93110 IRHQ93110P |
100V Quad P-Channel MOSFET in a 28-pin LCC package -100V 300kRad Hi-Rel Quad P -Channel TID Hardened MOSFET in a 28-pin LCC package
|
International Rectifier
|
| PM574 PM566 PM568 PM556 |
Precision Dual Supply Monitors with One Pin-Selectable Threshold and One Adjustable Input; Package: DFN; No of Pins: 8; Temperature Range: 0°C Precision Dual Supply Monitor with Pin-Selectable Thresholds; Package: SOT; No of Pins: 8; Temperature Range: 0°C to 70°C Analog IC Precision Quad Supply Monitor in 6-Lead SOT-23; Package: SOT; No of Pins: 6; Temperature Range: 0°C to 70°C
|
|
| ALD210808PCL ALD210808APCL ALD210808ASCL ALD210808 |
PRECISION N-CHANNEL EPAD MOSFET ARRAY QUAD HIGH DRIVE MATCHED PAIR
|
Advanced Linear Devices
|
| LX8221-DIDU LX8221-AIDU LX8221-GIDU LX8221-DIDUT L |
Quad 0.9 Ohm SPST Switch, 2xNO 2xNC, TQFN (3x3mm) 16-pin Analog IC Quad 0.9 Ohm SPST Switch, 4xNO, TSSOP 14-pin Quad 0.9 Ohm SPST Switch, 2xNO 2xNC, TSSOP 14-pin Quad 0.9 Ohm SPST Switch, 4xNC, TSSOP 14-pin Low Drop Out Regulator - Dual
|
Microsemi
|
| ALD210800APCL ALD210800SCL ALD210800PCL ALD210800A |
PRECISION N-CHANNEL EPAD MOSFET ARRAY QUAD HIGH DRIVE ZERO THRESHOLD MATCHED PAIR
|
Advanced Linear Devices
|
| LTC1518IS LTC15181 LTC1519IS LTC1519CSTR |
High Speed, Precision Delay RS485 Quad Line Receivers; Package: SO; No of Pins: 16; Temperature Range: 0°C to 70°C QUAD LINE RECEIVER, PDSO16 52Mbps Precision Delay RS485 Quad Line Receivers
|
Linear Technology, Corp.
|
| OCP-PCT4116E |
SIXTEEN PIN DIP QUAD CHANNEL PHOTOCOUPLER
|
LUMEX INC.
|