| PART |
Description |
Maker |
| DG387BDJ-E3 DG381BDJ-E3 DG384BDJ-E3 |
DUAL 1-CHANNEL, SGL POLE DOUBLE THROW SWITCH, PDIP14 DUAL 1-CHANNEL, SGL POLE SGL THROW SWITCH, PDIP14 ANLG SW DUAL SPST 22V/36V 14PDIP - Bulk IC SWITCH DUAL CMOS 14DIP Analog Switch Dual DPST 16-Pin PDIP
|
VISHAY SILICONIX
|
| HCPL0500 HCPL0501 HCPL0530 HCPL0531 HCPL0534 HCPL0 |
Single channel high speed transistor optocoupler. HIGH SPEED TRANSISTOR OPTOCOUPLERS 8-Pin SOIC Single-Channel High Speed Transistor 8-PIN, Output Optocoupler - No Base Connection 8-Pin SOIC Single-Channel High Speed Transistor Output Optocoupler SO8, 1MBIT/S HI SPEED DUAL CHANNEL TRANSISTOR - 1kV/us SO8, 1MBIT/S HI SPEED DUAL CHANNEL TRANSISTOR - 15kV/us 8-Pin SOIC 1 Mbit/s Single-Channel High Speed Transistor Output Optocoupler
|
FAIRCHILD[Fairchild Semiconductor]
|
| 2N3956TO-78 2N3956-TO-71 2N3956TO-71 |
2 CHANNEL, N-CHANNEL, Si, SMALL SIGNAL, JFET, TO-71 HERMETIC SEALED, TO-71, 6 PIN a Low Noise, Low Drift, Monolithic Dual N-Channel JFET
|
Micross Components
|
| OCP-PCT228A |
EIGHT PIN DIP DUAL CHANNEL PHOTOCOUPLER
|
LUMEX INC.
|
| OCP-PCT228A-TR |
EIGHT PIN SURFACE MOUNT DUAL CHANNEL PHOTOCOUPLER
|
LUMEX INC.
|
| ALD1116DA ALD1106SB ALD1106DB ALD1106 ALD1106PB AL |
QUAD/DUAL N-CHANNEL MATCHED PAIR MOSFET ARRAY Contact Gender:Pin; Circular Shell Style:Straight Plug; Insert Arrangement:22-35 RoHS Compliant: No TRANS NPN 40VCEO 10A TO-220F 双N沟道MOSFET的阵列匹 QUAD/DUAL N-CHANNEL MATCHED MOSFET ARRAY 双N沟道MOSFET的阵列匹
|
ALD[Advanced Linear Devices] Advanced Linear Devices, Inc.
|
| E8404A |
100-500MHz Dual Channel, Digitally Programmed Pin Electronics Solution
|
Semtech Corporation
|
| ISL55162 |
SOC Dual Channel 300MHz Pin Electronics/DAC/PMU/Deskew
|
Intersil Corporation
|
| ISL55164 |
SOC Dual Channel 133MHz Pin Electronics Solution 3.75ns Minimum Pulse Width
|
Intersil Corporation
|
| MAX398 MAX398CPE MAX398CSE MAX398EJE MAX398EPE MAX |
Precision, 8-Channel/Dual 4-Channel, Low-Voltage, CMOS Analog Multiplexers DUAL 4-CHANNEL, DIFFERENTIAL MULTIPLEXER, CDIP16 DC to 4-GBPS Dual 1:2 MUX/Repeater/Equalizer 48-VQFN -40 to 85 8-CHANNEL, SGL ENDED MULTIPLEXER, PDSO16 Precision / 8-Channel/Dual 4-Channel / Low-Voltage / CMOS Analog Multiplexers
|
MAXIM - Dallas Semiconductor Alliance Semiconductor, Corp. Maxim Integrated Products, Inc. MAXIM[Maxim Integrated Products]
|
| OM6233SS OM6227SS OM6233SSV OM6231SS OM6232SS OM62 |
1000V Dual N-Channel MOSFET in a S-6D package 500V Dual N-Channel MOSFET in a S-6D package 400V Dual N-Channel MOSFET in a S-6D package 500V Dual N-Channel MOSFET in a S-6E package 1000V Dual N-Channel MOSFET in a S-6E package SC70/µDFN, Single/Dual Low-Voltage, Low-Power µP Reset Circuits 10 A, 1000 V, 1.3 ohm, 2 CHANNEL, N-CHANNEL, Si, POWER, MOSFET HERMETIC SEALED, S-6D, SIP-6 400V Dual N-Channel MOSFET in a S-6E package 400V双N沟道MOSFET的在一个S - 6E条包 10 A, 1000 V, 1.3 ohm, 2 CHANNEL, N-CHANNEL, Si, POWER, MOSFET HERMETIC SEALED, S-6E, SIP-6
|
International Rectifier Electronic Theatre Controls, Inc. Atmel, Corp.
|