| PART |
Description |
Maker |
| EVM4LG EVM49G |
Ceramic Substrate Trimmer Potentiometers/EVM49/4L
|
PANASONIC[Panasonic Semiconductor]
|
| 3352W-1-200 3352V-1-102LF 3352V-1-201LF 3352V-1-10 |
Single-Turn Trimmer Potentiometers 3/8 RND 20OHMS 20% 0.5WATTS RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 20 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 1000 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 200 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 100000 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 100 ohm POT 5.0K OHM THUMBWHEEL CERM ST RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 5000 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 2000000 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 250000 ohm TRIMMER - 3/8" RD ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 50 ohm
|
Bourns, Inc.
|
| TZS2Z100A001 TZS2Z060A001 TZS2R200A001 TZY2Z030A00 |
Ceramic Trimmer Capacitors Crystal oscillators Hand radios Ceramic Trimmer Capacitors
|
Murata Manufacturing Co., Ltd. Murata Manufacturing Co...
|
| 3313S-1-500E 3313S-1-502E 3313S-1-205E 3313S-1-202 |
TRIMMER - SMD 3MM SQ ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.125 W, 5000 ohm SMD Single-Turn Trimmer Potentiometers 3mm 20M Horizontal Adj RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.125 W, 2000000 ohm TRIMMER - SMD 3MM SQ ST CERMET RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.125 W, 2000 ohm RES,Cermet,20KOhms,20 /-% Tol,-100,100ppm-TC,1314-Case RoHS Compliant: Yes RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.125 W, 20000 ohm
|
Bourns Inc. Bourns, Inc.
|
| AT5050QB10ZS-RV |
5.0X5.0mm SMD LED WITH CERAMIC SUBSTRATE
|
Kingbright Corporation
|
| TSC5 |
CERAMIC TRIMMER CAPACITOR - 5MM
|
Suntan Capacitors
|
| TSR-633 |
Trimmer Potentiometer-6mm Ceramic
|
Suntan Capacitors
|
| TSR-655 |
Trimmer Potentiometer-6mm Ceramic
|
Suntan Capacitors
|
| T93YA202KT20K11 T9313 T93XA105KT20 T93XA202KT20 T9 |
T93 - 3/8" Square Multi-Turn Cermet Trimmer 3/8 Square Multi-Turn Cermet Trimmer Trimmer, RESISTOR, TRIMMER, CERMET, 21 TURN(S), 0.5 W, 1000000 ohm, 3/8 INCH, SQUARE, 3 PINS, ROHS COMPLIANT Trimmer, RESISTOR, TRIMMER, CERMET, 21 TURN(S), 0.5 W, 2000 ohm, 3/8 INCH, RECTANGULAR, 3 PINS, ROHS COMPLIANT
|
Vishay Sfernice Vishay Siliconix
|
| XH201KT20 XH202KT20 XH254KT20 T73YE105KT20 |
Trimmer, RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 200 ohm, 1/4 INCH, SQUARE, 3 PINS, ROHS COMPLIANT Trimmer, RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 2000 ohm, 1/4 INCH, SQUARE, 3 PINS, ROHS COMPLIANT T73 - 1/4" Square Single-Turn Cermet Sealed Trimmer Trimmer, RESISTOR, TRIMMER, CERMET, 1 TURN(S), 0.5 W, 1000000 ohm, 1/4 INCH, SQUARE, 3 PINS, ROHS COMPLIANT
|
Vishay Sfernice
|
| 3345P-1-500 3345W-1-502 3345W-1-102 3345W-1-202 |
POT 50 OHM 1/2 RND WW SEAL ST RESISTOR, TRIMMER, WIRE WOUND, 1 TURN(S), 1 W, 50 ohm TRIMMER - 1/2" RD ST WW RESISTOR, TRIMMER, WIRE WOUND, 1 TURN(S), 1 W, 5000 ohm TRIMMER - 1/2" RD ST WW RESISTOR, TRIMMER, WIRE WOUND, 1 TURN(S), 1 W, 1000 ohm TRIMMER - 1/2" RD ST WW RESISTOR, TRIMMER, WIRE WOUND, 1 TURN(S), 1 W, 2000 ohm
|
Bourns, Inc.
|
|