| PART |
Description |
Maker |
| EVM818AHF E818AHF EDGE818 |
Octal 18V Pin Electronics Driver/window Comparator
|
SEMTECH[Semtech Corporation]
|
| E7802ALPT-T |
Low Cost, Dual-Channel, 15V Pin Electronics Driver/Window Comparator
|
Semtech Corporation
|
| E7765 |
1.3 GHz Quad Pin Electronics Driver
|
Semtech Corporation
|
| EDGE692 E692AHJ EVM692AHJ E692-EDGE692 |
200 MHz Monolithic Dual Pin Electronics Driver 200 MHz Monolithic Dual Pin Electronics Driver 200兆赫单片双引脚电子驱动器
|
SEMTECH[Semtech Corporation] Semtech, Corp.
|
| EVM6435 EVM6436 EDGE6435 EDGE6436 |
Per-Pin Electronics Companion DAC
|
Semtech Corporation
|
| E8410A |
1GHz Dual Channel, Digitally Programmed Pin Electronics Solution
|
Semtech Corporation
|
| E8405A |
100-500MHz Dual Channel, Digitally Programmed Pin Electronics Solution
|
Semtech Corporation
|
| IDTCSPU877DBV IDTCSPU877DBVG IDTCSPU877DNLG |
1.8V PHASE LOCKED LOOP DIFFERENTIAL 1:10 SDRAM CLOCK DRIVER Replacement for Intel part number MR8751H-8/BYA. Buy from authorized manufacturer Rochester Electronics. 877 SERIES, PLL BASED CLOCK DRIVER, 10 TRUE OUTPUT(S), 0 INVERTED OUTPUT(S), PQCC40
|
Integrated Device Technology, Inc.
|
| MP420907 |
High Power, High Speed Switching Applications For Printer Head Pin Driver and Pulse Motor Driver For Solenoid Driver
|
Toshiba Semiconductor
|