| PART |
Description |
Maker |
| IDT75K52413 |
4.5M Integrated Network Search Engine (NSE) with Quad AMCC XSC Interface Network Search Engines with Integrated NPU Interface 4.5M Network Search Engine (NSE) with Quad AMCC XSC Interface
|
IDT Integrated Device Technology
|
| OX16PCI954 OX16PCI954-TQC60-A |
Integrated Quad UART and PCI interface
|
OXFORD[Oxford Semiconductor] ETC
|
| XR-T5793IV XR-T5793IJ XR-T5793 |
Quad E1 Line Interface Unit
|
EXAR[Exar Corporation]
|
| DS21348 DS21348G DS21348GN DS21348T DS21348TN DS21 |
3.3V E1/T1/J1 Line Interface Single/Quad
|
DALLAS[Dallas Semiconductor] DALLAS[Dallas Semiconducotr] Maxim
|
| TLIU04C1 |
TLIU04C1 Quad T1/E1 Line Interface
|
AGERE[Agere Systems]
|
| NTE2631 |
Integrated Circuit Quad Differential Line Driver
|
NTE[NTE Electronics]
|
| IDT82V2054BBG |
QUAD E1 SHORT HAUL LINE INTERFACE UNIT
|
Integrated Device Technology
|
| PEF22504 PEF22504HT |
Quad E1/T1/J1 Line Interface Component for Long- and Short-Haul Applications
|
Infineon Technologies A...
|
| PM4314 PM4314-RI |
QUAD T1/E1 LINE INTERFACE DEVICE DATACOM, PCM TRANSCEIVER, PQFP128
|
PMC-Sierra, Inc.
|
| DM74AS157 DM74AS157M DM74AS157N DM74AS157SJX DM74A |
Quad 1 of 2 Line Data Selector/Multiplexer AS SERIES, QUAD 2 LINE TO 1 LINE MULTIPLEXER, TRUE OUTPUT, PDSO16 Quad 2-Line to 1-Line Data Selector/Multiplexer
|
FAIRCHILD SEMICONDUCTOR CORP Fairchild Semiconductor, Corp. FAIRCHILD[Fairchild Semiconductor]
|
| IDT82V1671 IDT82V1671J |
CHIPSET OF RINGING SUBSCRIBER LINE INTERFACE CIRCUIT (RSLIC) & QUAD PROGRAMMABLE PCM CODEC
|
Integrated Device Technology IDT
|
| IDT82V1074PF IDT82V1671J |
CHIPSET OF RINGING SUBSCRIBER LINE INTERFACE CIRCUIT (RSLIC) & QUAD PROGRAMMABLE PCM CODEC
|
Integrated Device Technology, Inc.
|