| PART |
Description |
Maker |
| 28236-DSH-001-B 28236-DSH-001-B-15 |
ATM ServiceSAR Plus with xBR Traffic Management
|
M/A-COM Technology Solution...
|
| AMD-640 |
64-Bit Socket 7 Interface, Integrated Write back Cache Controller, System Memory Controller, and PCI Bus Controller.(64位系统控制器(包括高速缓冲存储器控制器,系统存储器控制器和PCI总线控制)
|
Advanced Micro Devices, Inc.
|
| ADT7460 |
dB COOL Remote Thermal Controller and Fan Controller dBCOOL Thermal Management Controller and Voltage Monitor
|
Analog Devices, Inc.
|
| R1280D002A-TR R1280D002B R1280D002B-TR R1280D002C |
2CH PWM DC/DC Controller 0.05 A DUAL SWITCHING CONTROLLER, 805 kHz SWITCHING FREQ-MAX, PDSO10 2CH PWM DC/DC Controller 2声道的PWM DC / DC控制
|
Ricoh Co., Ltd. RICOH electronics devic...
|
| 82C37 HS-82C37RH |
CMOS High Performance Programmable DMA Controller Direct Memory Access Controller, CMOS, 2.5MBPS, 50A, Rad-Hard DMA Controller, Programmable, CMOS, 5, 8, and 12.5MHz
|
Intersil
|
| NX2309 NX2309CMTR |
SINGLE SUPPLY 12V SYNCHRONOUS PWM CONTROLLER WITH NMOS LDO CONTROLLER
|
Microsemi Corporation
|
| USB97CFDC2-MV-01 USB97CFDC2-MV-01X |
USB Floppy Disk Controller UNIVERSAL SERIAL BUS CONTROLLER, PQFP100
|
SMSC Corporation SMSC, Corp.
|
| ISL6244 |
PWM Controller, Multiphase Power Controller with 2, 3, or 4 Phase for AMD Mobile Hammer
|
Intersil
|
| EDS11-132B |
Digital Controller COMPACT CONTROLLER M [CC-M](PROGRAMMABLE CONTINUOUS OUTPUT TYPE)
|
Fuji Electric
|
| NC41120-0018 |
STANDARD MICRO CONTROLLER SPECIFICATION USB INTERFACE CONTROLLER CHIP
|
Fujitsu Component Limited. Fujitsu Media Devices Limited
|