| PART |
Description |
Maker |
| EVM7804BHFT E7804BHFT |
133 MHZ Quad Pin Electronics Driver and Window Comparator
|
Semtech Corporation
|
| EVM7765AXF E7765AXF |
1.3 GHz Quad Pin Electronics Driver
|
Semtech Corporation
|
| EMS-1NTR |
1 MHz - 500 MHz RF/MICROWAVE DOUBLE BALANCED MIXER, 8 dB CONVERSION LOSS-MAX R-1, 8 PIN E-Series Plug-In Mixer 1500 MHz E系列插件混合500兆赫
|
M/A-COM Technology Solutions, Inc.
|
| SO-720-LPC-GBA-155.5200MHZ SO-720-LPC-GCA-155.5200 |
CLOCK SAW OSCILLATOR, 155.52 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 531.25 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 156.25 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 707.3527 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 690.5692 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 150 MHz - 1000 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 150 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 1000 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 312.5 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 187.5 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 175 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 160 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 194.8 MHz ROHS COMPLIANT, HERMETIC SEALED, CERAMIC, SMD, 6 PIN CLOCK SAW OSCILLATOR, 320 MHz CLOCK SAW OSCILLATOR, 720 MHz CLOCK SAW OSCILLATOR, 500 MHz
|
Vectron International, Inc.
|
| BPF-2A-500 BPF-2A-250 BPF-2A-1500 BPF-2A-2250 |
2 MHz - 500 MHz RF/MICROWAVE BIPHASE MODULATOR HERMETIC, 8 PIN BIPHASE MODULATORS
|
Merrimac Industries, Inc.
|
| MRF275G MRF275 |
150 W, 28 V, 500 MHz N.CHANNEL MOS BROADBAND 100 - 500 MHz RF POWER FET
|
MOTOROLA[Motorola, Inc]
|
| MRF275G |
150 W, 28 V, 500 MHz N.CHANNEL MOS BROADBAND 100 - 500 MHz RF POWER F
|
MOTOROLA
|
| MAAMSS00014SMB-01 MAAMSS00014SMB-02 MAAMSS0014 MAA |
BROADBAND DRIVER AMPLIFIER 500 - 2400 MHZ
|
MACOM[Tyco Electronics]
|
| SKY12332-310LF |
6-Bit Digital Attenuator with Driver LF-1 GHz, 0.5 dB LSB, 31.5 dB Range 500 MHz - 1000 MHz RF/MICROWAVE VARIABLE ATTENUATOR, 2.2 dB INSERTION LOSS-MAX
|
Skyworks Solutions, Inc.
|
| AM-131PIN AMC-123SMA AMC-123 AM-123PIN |
High Performance Amplifier, 10 dB Gain 5 - 500 MHz Circular Connector; No. of Contacts:15; Series:MS27508; Body Material:Aluminum; Connecting Termination:Crimp; Connector Shell Size:14; Circular Contact Gender:Pin; Circular Shell Style:Box Mount Receptacle; Insert Arrangement:14-15 RoHS Compliant: No High Performance Amplifier/ 10 dB Gain 5 - 500 MHz
|
Tyco Electronics
|
| AA113-310LF |
GaAs IC 6-Bit Digital Attenuator with Driver 0.5 dB LSB Positive Control LF-1 GHz 500 MHz - 1000 MHz RF/MICROWAVE VARIABLE ATTENUATOR, 2.2 dB INSERTION LOSS-MAX
|
Skyworks Solutions, Inc.
|
|