| PART |
Description |
Maker |
| AT-220 AT-101 AT-102 AT-100 AT-210 AT-303 AT-306 A |
ER 3C 2#16 1#0 SKT RECP BOX ER 4C 4#8 SKT RECP BOX ER 9C 8#16 1#8 SKT RECP BOX ER 8C 8#12 SKT RECP ER 7C 7#16 PIN RECP BOX Fixed Attenuators (SMA Type) 固定衰减器(SMA型)
|
Hirose Electric USA, INC. HIROSE ELECTRIC Co., Ltd.
|
| DG529BK DG529BY DG528CY DG526CJ DG526CK DG526CY DG |
From old datasheet system CAC 7C 7#16S SKT RECP BOX 模拟CMOS锁存多路复用 Analog CMOS Latchable Multiplexers 8-CHANNEL, DIFFERENTIAL MULTIPLEXER, PDSO28
|
INTERSIL[Intersil Corporation] Intersil, Corp.
|
| ATTINY13-12SI ATTINY13-12SJ ATTINY13-12SSJ ATTINY1 |
8-bit AVR Microcontroller with 1K Bytes In-System Programmable Flash ER 6C 4#16 2#8 SKT RECP BOX ER 5C 1#16 4#12 SKT RECP ER 5C 3#16 2#8 SKT RECP BOX ER 4C 4#16 SKT RECP BOX -bit AVR Microcontroller with 8K Bytes In- System Programmable Flash
|
Atmel Corp.
|
| FAR-D5CC-881M50-D1C8-Q FAR-D5CC-881M50-D1C8-T FAR- |
CAC 4C 4#12 PIN RECP BOX SAW Duplexer (700 to 1000 MHz)
|
FUJITSU LTD Fujitsu Limited Fujitsu Component Limited. FUJITSU[Fujitsu Media Devices Limited] Fujitsu Microelectronics
|
| AT83251G2D-3CSUM AT80251G2D-3CSUM AT87251G2D-3CSUM |
CONNECTORS, INDUSTRIAL; SERIES:97/MS; CONNECTOR TYPE:CIRCULAR; ER 3C 3#8 SKT RECP BOX B/16-BIT MICROCONTROLLER WITH SERIAL COMMUNICATION INTERFACES 16-BIT, OTPROM, 24 MHz, MICROCONTROLLER, PQCC44 B/16-BIT MICROCONTROLLER WITH SERIAL COMMUNICATION INTERFACES 16-BIT, 24 MHz, MICROCONTROLLER, PDIP40 ER 3C 3#8 SKT RECP BOX 16-BIT, 16 MHz, MICROCONTROLLER, PQCC44
|
Atmel Corp. Atmel, Corp. TEMIC SEMICONDUCTORS
|
| B772 |
TO-126 Plastic-Encapsulate Transistors ER 10C 10#16 SKT RECP BOX
|
List of Unclassifed Manufacturers Electronic Theatre Controls, Inc.
|
| ICM7207 ICM7207A ICM7207AEV ICM7207AIJD ICM7207AIP |
CMOS Timebass Generator 发电机的CMOS Timebass PTB 26C 26#20 PIN/SKT RECP 发电机的CMOS Timebass PTB 36C 36#20 PIN/SKT RECP JTG 32C 32#20 SKT PLUG JT 128C 128#22D SKT PLUG
|
Intersil, Corp. Intersil Corporation
|
| 24LC02BTI/MS 24LC02BTI/MSG 24LC02BTI/OT 24LC02BTI/ |
BUSS FUSEBLOCK RoHS Compliant: Yes 2K的I2C串行EEPROM MB 12C 8#20 4#16 SKT RECP 2K的I2C串行EEPROM 2K I2C Serial EEPROM 2K的I2C串行EEPROM MB 12C 8#20 4#16 PIN RECP MB 8C 8#20 PIN RECP MB 8C 8#20 SKT RECP Connectors, Cable Assemblies, Fuse Holder; Leaded Process Compatible:No; Peak Reflow Compatible (260 C):No RoHS Compliant: Yes PLUG,PUSH ON Connector Adapter; Convert From:F Plug; Convert To:Belden 1694
|
Microchip Technology, Inc. Microchip Technology Inc.
|
| API8208 API8208A |
VERSATILE 20 SEC INSTANT VOICE ROM LJT 53C 53#20 SKT RECP LJT 53C 53#20 SKT WALL RECP
|
Aplus Intergrated Circuits Aplus Integrated Circuits Inc.
|